(( AVAILABLE FROM MAY 5, 2021 ONLY ))
STEP TO FOLLOW :
Turnkey:
– Supply and installation of the quantity of peat you have ordered
– Roll the turf after laying to eliminate air pockets under the sods and improve root-soil contact.
– Clean-up by collecting grass clippings once installation is complete, and return of empty pallets
The customer must ensure that :
– Soil preparation and levelling of the new topsoil must have been done by the customer just before our team lays the peat.
– The key to success is definitely watering. As soon as the installation is complete, the customer must water all the lawns. Water 1 to 2 times a day for the first 10 to 20 days, depending on temperature.
– Avoid trampling during the watering period
(( AVAILABLE FROM MAY 5, 2021 ONLY ))
(*) Deadlines before work is carried out within 4 working days of the order being posted as accepted by Boutiquehortiplan. If this falls on a weekend or public holiday, installation will be postponed until the next working day. The soil must be dry and not soaked by rain. The day may be postponed by 24 hours if no more peat is available on the scheduled day. Once ordered, the sale is final and non-refundable due to the reservation of the preparation and cutting of the peat.
Weight | 000 kg |
---|
Reviews
There are no reviews yet.